Project · Offshore wind · United Kingdom
Lynn
Read from the Radar item below (2026-11-12); only what the source says.
- Engineering (next)
- Fabrication
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Before engineering
Next Engineering · not announced
Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- XceCoOperator / owneroperator / owner, as named in the source
- Deutsche Windtechnik Offshore LtdOther roleoperations and maintenance
- Kind
- Offshore wind
- Country
- United Kingdom
- Operator
- XceCo
- Position
- country only
Sources
- DWT Clinches Five-Year O&M Contract for Two UK Offshore Wind FarmsoffshoreWIND.biz · published 2026-11-12 · read 2026-11-13