Project · LNG

Louisiana LNG expansion project

Read from the Radar item below (2026-11-06); only what the source says.

  1. Engineering (next)
  2. Fabrication
  3. Construction
  4. Hook-up
  5. Commissioning
  6. Operation

Now Before engineering

Next Engineering · Q1 2027 (early 2027, as reported)

Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • Venture GlobalOperator / owneroperator / owner, as named in the source
  • WorleyEPC / main contractorEPC
Kind
LNG
Country
not announced
Operator
Venture Global
Position
not announced

Sources

  1. Worley awarded EPC contract for Venture Global LNG expansionOffshore Energy (Navingo) · published 2026-11-06 · read 2026-11-08