Project · Oil & gas, offshore · Egypt
Lotus Area
Read from the Radar item below (2026-10-06); only what the source says.
- Engineering (next)
- Fabrication
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Before engineering
Next Engineering · not announced
Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- Kind
- Oil & gas, offshore
- Country
- Egypt
- Operator
- EGAS
- Position
- country only
On the Radar each linked to its source
Sources
- Chevron signs Lotus Area exploration deal off Egypt with two-well commitmentOffshore Energy (Navingo) · published 2026-10-06 · read 2026-10-23