Project · Grid & HVDC · Germany
LanWin 3
Read from the Radar item below (2026-09-18); only what the source says.
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Engineering (reported: Engineering)
Next Fabrication · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- 50HertzOperator / owneroperator / owner, as named in the source
- Neptun Smulders Offshore RenewablesOther roleawarded contract for 2 GW converter platform
Who else needs construction people in Northwest Europe
May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.
How we count
Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.
- Kind
- Grid & HVDC
- Country
- Germany
- Operator
- 50Hertz
- Position
- country only
On the Radar each linked to its source
Sources
- NSORe joint venture lands second 2 GW converter platform deal with 50HertzoffshoreWIND.biz · published 2026-09-18 · read 2026-10-23