Project · Offshore wind · Finland
Korsnäs offshore wind farm
Finland, Baltic Sea. Planned start of operation (Global Wind Power Tracker, page of 2026-02-05): 2034.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (next)
- Fabrication
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Before engineering (reported: Pre-construction per the Global Wind Power Tracker (page of 2026-02-05))
Next Engineering · not announced
Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- VattenfallOperator / ownerdeveloper and builder, selected partner (Metsähallitus tender, December 2022)
- MetsähallitusOther roleproject developer and lessor of the state sea area (state enterprise; does not own the wind farm)
- Kind
- Offshore wind
- Country
- Finland
- Size
- 2000 MW
- Operator
- Vattenfall
- Position
- 62.78°N 20.80°E, as published
Sources
- Korsnäs - pre-construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24