Project · Offshore wind · Finland

Korsnäs offshore wind farm

Finland, Baltic Sea. Planned start of operation (Global Wind Power Tracker, page of 2026-02-05): 2034.

From the public registers below, read 2026-10-24; only what they say.

  1. Engineering (next)
  2. Fabrication
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Before engineering (reported: Pre-construction per the Global Wind Power Tracker (page of 2026-02-05))

Next Engineering · not announced

Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • VattenfallOperator / ownerdeveloper and builder, selected partner (Metsähallitus tender, December 2022)
  • MetsähallitusOther roleproject developer and lessor of the state sea area (state enterprise; does not own the wind farm)
Kind
Offshore wind
Country
Finland
Size
2000 MW
Operator
Vattenfall
Position
62.78°N 20.80°E, as published

Sources

  1. Korsnäs - pre-construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24