Project · Deepwater FPSO · Ghana

John Agyekum Kufuor FPSO

Read from the Radar item below (2026-10-05); only what the source says.

  1. Engineering (next)
  2. Fabrication
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Before engineering

Next Engineering · not announced

Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Later Commissioning Q1 2028 (due by Q1 2028, as reported)

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • EniOperator / owneroperator / owner, as named in the source
Kind
Deepwater FPSO
Country
Ghana
Operator
Eni
Position
country only

Sources

  1. Yinson adds Ghana FPSO gas-upgrade scope and a four-year lease extensionOffshore Energy (Navingo) · published 2026-10-05 · read 2026-10-23