Project · Oil & gas, offshore · Norway

Johan Sverdrup templates (J, N)

New facilities on the Johan Sverdrup field, as Sodir lists them.

From the public registers below, read 2026-10-24; only what they say.

  1. Engineering (done)
  2. Fabrication (done)
  3. Transport & installation (now)
  4. Hook-up (next)
  5. Commissioning
  6. Operation

Now Transport & installation (reported: Sodir facility phase: Johan Sverdrup J installation, Johan Sverdrup N installation (updated 29 Aug 2026))

Next Hook-up · not announced

Roles Construction & supervision · Commissioning & start-up · QA/QC & HSE · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • EquinorOperator / owneroperator (Sodir)

Who else needs construction people in Northwest Europe

May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.

46Oct 2026381513Jan 2027162336Apr 2027565346Jul 20274034
announced projectsplanned stopstypical phase length, not announcedas of 2026-10-24
How we count

Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.

Reserve people now

Kind
Oil & gas, offshore
Country
Norway
Operator
Equinor
Position
58.72°N 2.59°E, as published

Sources

  1. Facility Johan Sverdrup J - INSTALLATIONSodir FactPages · published 2026-08-29 · read 2026-10-24
  2. Facility Johan Sverdrup N - INSTALLATIONSodir FactPages · published 2026-08-29 · read 2026-10-24