Project · Offshore wind · Netherlands

Hollandse Kust (Zuid) wind farm

Fully operational since 2024; first Dutch offshore wind farm built without subsidy.

As reported by the source below (2026-09-19).

  1. Engineering (done)
  2. Fabrication (done)
  3. Transport & installation (done)
  4. Hook-up (done)
  5. Commissioning (done)
  6. Operation (now)

Now Operation (reported: operational)

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • VattenfallOperator / owneroperator (with BASF, Allianz)
Kind
Offshore wind
Country
Netherlands
Size
1500 MW
Operator
Vattenfall
Position
52.30°N 4.08°E, approximate

Sources

  1. Hollandse Kust (Zuid) wind farm - source pagegroup.vattenfall.com · read 2026-09-19