Project · Offshore wind · Netherlands
Hollandse Kust (Zuid) wind farm
Fully operational since 2024; first Dutch offshore wind farm built without subsidy.
As reported by the source below (2026-09-19).
- Engineering (done)
- Fabrication (done)
- Transport & installation (done)
- Hook-up (done)
- Commissioning (done)
- Operation (now)
Now Operation (reported: operational)
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- VattenfallOperator / owneroperator (with BASF, Allianz)
- Kind
- Offshore wind
- Country
- Netherlands
- Size
- 1500 MW
- Operator
- Vattenfall
- Position
- 52.30°N 4.08°E, approximate
Sources
- Hollandse Kust (Zuid) wind farm - source pagegroup.vattenfall.com · read 2026-09-19