Project · Offshore wind · Germany
He Dreiht offshore wind farm
Germany, North Sea. Planned start of operation (Global Wind Power Tracker, page of 2026-02-05): 2026.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (done)
- Fabrication (done)
- Transport & installation (done)
- Hook-up (done)
- Commissioning (now)
- Operation (next)
Now Commissioning (reported: Inaugurated in September 2026; turbines still being commissioned (Maritime Executive, 21 Sep 2026))
Next Operation · not announced
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- EnBWOperator / owneroperator (Global Wind Power Tracker)
- Kind
- Offshore wind
- Country
- Germany
- Size
- 960 MW
- Operator
- EnBW
- Position
- 54.37°N 6.19°E, as published
Sources
- Germany's largest offshore wind farm inaugurated as commissioning proceedsThe Maritime Executive · published 2026-09-21 · read 2026-10-23
- He Dreiht - construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24