Project · Offshore wind · Germany

He Dreiht offshore wind farm

Germany, North Sea. Planned start of operation (Global Wind Power Tracker, page of 2026-02-05): 2026.

From the public registers below, read 2026-10-24; only what they say.

  1. Engineering (done)
  2. Fabrication (done)
  3. Transport & installation (done)
  4. Hook-up (done)
  5. Commissioning (now)
  6. Operation (next)

Now Commissioning (reported: Inaugurated in September 2026; turbines still being commissioned (Maritime Executive, 21 Sep 2026))

Next Operation · not announced

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • EnBWOperator / owneroperator (Global Wind Power Tracker)
Kind
Offshore wind
Country
Germany
Size
960 MW
Operator
EnBW
Position
54.37°N 6.19°E, as published

Sources

  1. Germany's largest offshore wind farm inaugurated as commissioning proceedsThe Maritime Executive · published 2026-09-21 · read 2026-10-23
  2. He Dreiht - construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24