Project · Power plant · Poland

Gryfino OCGT peaking power plant

New open-cycle gas unit, distinct from the existing or separately developed combined-cycle plant at this location. The EPC remuneration has both PLN and EUR components; the PLN figure alone is not total project cost.

Checked by hand against the sources below (2026-11-08).

  1. Engineering
  2. Fabrication
  3. Transport & installation (next)
  4. Hook-up
  5. Commissioning
  6. Operation

Now Before engineering (reported: EPC and service contracts signed 4 March 2026; design was scheduled from March 2026 and construction from May/June 2027.)

Next Transport & installation · not announced

Roles Project management & controls · Construction & supervision · QA/QC & HSE · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

Who else needs construction people in Northwest Europe

May 2027 is busier than usual here: 64 projects and stops in this phase, against a typical 21.5 a month.

34Nov 2026161317Feb 2027264064May 2027555144Aug 20273932
announced projectsplanned stopstypical phase length, not announcedas of 2026-11-11
How we count

Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.

Reserve people now

Contract awards public notices that name this project

Kind
Power plant
Country
Poland
Size
Approximately 600 MWe
Operator
PGE Inwest 27
Position
country only

Sources

  1. Official award notice 197196-2026TED, Tenders Electronic Daily (EU) · published 2026-03-23 · read 2026-11-08
  2. Rybnik and Gryfino OCGT contracts and timetablePolimex Mostostal · published 2026-03-04 · read 2026-11-08