Project · Power cable · Australia

Gippsland offshore-wind grid link

Read from the Radar item below (2026-10-15); only what the source says.

  1. Engineering (now)
  2. Fabrication (next)
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Engineering (reported: Engineering)

Next Fabrication · not announced

Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Later Operation 2031 (completion is targeted for 2031, as reported)

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • VicGridOperator / owneroperator / owner, as named in the source
  • AccionaEngineering & designpreferred development partner for design and procurement
Kind
Power cable
Country
Australia
Operator
VicGrid
Position
country only

Sources

  1. VicGrid chooses Acciona to develop Gippsland offshore-wind grid linkoffshoreWIND.biz · published 2026-10-15 · read 2026-10-23