Project · Power cable · Australia
Gippsland offshore-wind grid link
Read from the Radar item below (2026-10-15); only what the source says.
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Engineering (reported: Engineering)
Next Fabrication · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Later Operation 2031 (completion is targeted for 2031, as reported)
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- Kind
- Power cable
- Country
- Australia
- Operator
- VicGrid
- Position
- country only
On the Radar each linked to its source
Sources
- VicGrid chooses Acciona to develop Gippsland offshore-wind grid linkoffshoreWIND.biz · published 2026-10-15 · read 2026-10-23