Project · Oil & gas, offshore · Norway
Galtvort discovery (6407/8-4 S)
gas discovery, Norwegian sea, licence 1223.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Engineering (reported: Production in clarification phase (Sodir discovery status, updated 2 Jul 2026); licence 1223 must submit a plan for development by 15 Jul…)
Next Fabrication · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- OKEAOperator / owneroperator (Sodir)
Who else needs construction people in Northwest Europe
May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.
How we count
Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.
- Kind
- Oil & gas, offshore
- Country
- Norway
- Operator
- OKEA
- Position
- 64.45°N 7.65°E, approximate
Sources
- Discovery 6407/8-4 S (Galtvort) - Production in clarification phaseSodir FactPages · published 2026-07-02 · read 2026-10-24
- Licence 1223 - task: submit plan for development, due 15 Jul 2027Sodir FactPages · read 2026-10-24