Project · Deepwater FPSO · Guyana
FPSO Jaguar — Whiptail development, Stabroek Block
A brand-new deepwater FPSO hull and topsides being built and commissioned from scratch, on the standardised Fast4Ward programme SBM now repeats project after project — steady multi-year demand for FPSO engineering, hook-up/commissioning and offshore installation crews.
Checked by hand against the sources below (2026-10-20).
- Engineering (done)
- Fabrication (now)
- Transport & installation (now)
- Hook-up (next)
- Commissioning
- Operation
Now Fabrication · Transport & installation (reported: integration / installation (FPSO: topsides fabrication nearing completion, all process modules lifted onboard, integration and…)
Next Hook-up · not announced
Roles Construction & supervision · Commissioning & start-up · QA/QC & HSE · Role groups per phase: our planning assumption from the Crew Forecast model.
Later Operation Q4 2027 (first production targeted end of 2027, as reported)
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- ExxonMobilOperator / owneroperator / field developer; operator / owner, as named in the source
- SBM OffshoreEngineering & designFPSO design, construction and operations contractor under Fast4Ward; Sale & Operate, with ownership transferred to the client during construction.
- Kind
- Deepwater FPSO
- Country
- Guyana
- Size
- 250,000 bopd oil, 540 MMcfd associated gas treatment, 300,000 bpd water injection; ~2 MMbbl storage
- Operator
- ExxonMobil
- Position
- 9.50°N 57.00°W, approximate
On the Radar each linked to its source
Sources
- SBM Offshore Awarded Contracts for ExxonMobil Guyana's FPSO JaguarSBM Offshore (company newsroom) · published 2024 · read 2026-09-19
- SBM Offshore to build FPSO Jaguar for ExxonMobil's Whiptail oil and gas project offshore GuyanaWorld Oil · published 2024-04-18 · read 2026-09-19
- Offshore installation begins for Whiptail project's subsea systemBrazil Energy Insight (trade press) · published 2026-07-29 · read 2026-09-19
- SBM Offshore Half Year 2026 EarningsSBM Offshore (company newsroom / half-year report PDF) · published 2026-08-06 · read 2026-10-20
- Seatrium 1H2026 Results presentation (order book project table)Seatrium Limited (SGX filing) · published 2026-07-31 · read 2026-10-08
- ExxonMobil lets SIMOPS management platform for WhiptailOil & Gas Journal · published 2026-08-04 · read 2026-10-08
- SBM Offshore completes US$1.5 billion financing of JaguarSBM Offshore · published 2024-11-21 · read 2026-10-20