Project · Offshore wind · Poland
FEW Baltic II offshore wind farm
Poland, Baltic Sea. Planned start of operation (Global Wind Power Tracker, page of 2026-02-05): 2030.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Engineering (reported: Pre-construction per the Global Wind Power Tracker (page of 2026-02-05))
Next Fabrication · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- RWEOperator / owneroperator (Global Wind Power Tracker); owner (Global Wind Power Tracker)
Who else needs construction people in Northwest Europe
May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.
How we count
Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.
- Kind
- Offshore wind
- Country
- Poland
- Size
- 390 MW
- Operator
- RWE
- Position
- 55.09°N 16.64°E, approximate
Sources
- FEW Baltic II - pre-construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24