Project · Naval shipbuilding · Germany

F128

Read from the Radar item below (2026-10-22); only what the source says.

  1. Engineering (done)
  2. Fabrication (now)
  3. Construction (next)
  4. Hook-up
  5. Commissioning
  6. Operation

Now Fabrication (reported: Fabrication)

Next Construction · not announced

Roles Project management & controls · Construction & supervision · QA/QC & HSE · Role groups per phase: our planning assumption from the Crew Forecast model.

Later Operation 2029 (from 2029, as reported)

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • German NavyOperator / owneroperator / owner, as named in the source
  • MSI-DSOther roleSeahawk Light Gun Systems

Who else needs construction people in Northwest Europe

May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.

46Oct 2026381513Jan 2027162336Apr 2027565346Jul 20274034
announced projectsplanned stopstypical phase length, not announcedas of 2026-10-24
How we count

Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.

Reserve people now

Kind
Naval shipbuilding
Country
Germany
Operator
German Navy
Position
country only

Sources

  1. Future German F128 Frigates To Receive MSI-DS Seahawk Light Gun SystemsNaval News · published 2026-10-22 · read 2026-10-23