Project · Floating wind · United Kingdom
Cluaran Ear-Thuath floating wind farm
United Kingdom, North Sea. Planned start of operation (Global Wind Power Tracker, page of 2025-02-09): 2033.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (next)
- Fabrication
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Before engineering (reported: Pre-construction per the Global Wind Power Tracker (page of 2025-02-09))
Next Engineering · not announced
Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- Thistle Wind PartnersOperator / ownerowner, 100% (Global Wind Power Tracker)
- Kind
- Floating wind
- Country
- United Kingdom
- Size
- 1008 MW
- Operator
- Thistle Wind Partners
- Position
- 58.92°N 1.26°W, approximate
Sources
- Cluaran Ear-Thuath - pre-construction (page of 2025-02-09)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2025-02-09 · read 2026-10-24