Project · Oil & gas, offshore · Norway
Carmen discovery (35/10-10 S)
gas and condensate discovery, North sea, licence 1148.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Engineering (reported: Production in clarification phase (Sodir discovery status, updated 8 Apr 2026); licence 1148 must submit a plan for development by 11 Mar…)
Next Fabrication · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- Wellesley PetroleumOperator / owneroperator (Sodir)
Who else needs construction people in Northwest Europe
May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.
How we count
Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.
- Kind
- Oil & gas, offshore
- Country
- Norway
- Operator
- Wellesley Petroleum
- Position
- 61.02°N 3.16°E, approximate
Sources
- Discovery 35/10-10 S (Carmen) - Production in clarification phaseSodir FactPages · published 2026-04-08 · read 2026-10-24
- Licence 1148 - task: submit plan for development, due 11 Mar 2029Sodir FactPages · read 2026-10-24