Project · Offshore wind · Netherlands

Borssele III/IV wind farm

Fully operational since the beginning of 2021.

As reported by the source below (2026-09-19).

  1. Engineering (done)
  2. Fabrication (done)
  3. Transport & installation (done)
  4. Hook-up (done)
  5. Commissioning (done)
  6. Operation (now)

Now Operation (reported: operational)

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • BlauwwindOperator / owneroperator (consortium of Partners Group, Shell, Eneco, Van Oord, DGE/Mitsubishi)
Kind
Offshore wind
Country
Netherlands
Size
731 MW
Operator
Blauwwind
Position
51.69°N 2.99°E, approximate

Sources

  1. Borssele III/IV wind farm - source pageeneco.nl · read 2026-09-19