Project · Offshore wind · Netherlands

Borssele I/II wind farm

Operational since 2020.

As reported by the source below (2026-09-19).

  1. Engineering (done)
  2. Fabrication (done)
  3. Transport & installation (done)
  4. Hook-up (done)
  5. Commissioning (done)
  6. Operation (now)

Now Operation (reported: operational)

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

Kind
Offshore wind
Country
Netherlands
Size
752 MW
Operator
Ørsted
Position
51.75°N 3.06°E, approximate

Sources

  1. Borssele I/II wind farm - source pageorsted.com · read 2026-09-19