Project · Offshore wind · Netherlands
Borssele I/II wind farm
Operational since 2020.
As reported by the source below (2026-09-19).
- Engineering (done)
- Fabrication (done)
- Transport & installation (done)
- Hook-up (done)
- Commissioning (done)
- Operation (now)
Now Operation (reported: operational)
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- ØrstedOperator / owneroperator
- Kind
- Offshore wind
- Country
- Netherlands
- Size
- 752 MW
- Operator
- Ørsted
- Position
- 51.75°N 3.06°E, approximate
Sources
- Borssele I/II wind farm - source pageorsted.com · read 2026-09-19