Project · Oil & gas, offshore · Norway
Bestla field development
oil and gas field, North sea. Main supply base: Mongstad.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (done)
- Fabrication (done)
- Transport & installation (now)
- Hook-up (next)
- Commissioning
- Operation
Now Transport & installation (reported: Approved for production (Sodir field status, updated 23 Oct 2026); facilities Bestla (installation), Brasse WI Satellite (future))
Next Hook-up · not announced
Roles Construction & supervision · Commissioning & start-up · QA/QC & HSE · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- OKEAOperator / owneroperator (Sodir)
Who else needs construction people in Northwest Europe
May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.
How we count
Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.
- Kind
- Oil & gas, offshore
- Country
- Norway
- Operator
- OKEA
- Position
- 60.44°N 3.03°E, approximate
Sources
- Field Bestla - Approved for productionSodir FactPages · published 2026-10-23 · read 2026-10-24