Project · Floating wind · United Kingdom

Beech South floating wind farm

United Kingdom, North Sea.

From the public registers below, read 2026-10-24; only what they say.

  1. Engineering (next)
  2. Fabrication
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Before engineering (reported: Pre-construction per the Global Wind Power Tracker (page of 2024-05-31))

Next Engineering · not announced

Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

No company named in the sources yet: not announced.

Kind
Floating wind
Country
United Kingdom
Size
1008 MW
Operator
not announced
Position
56.97°N 2.16°E, approximate

Sources

  1. Beech South - pre-construction (page of 2024-05-31)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2024-05-31 · read 2026-10-24