Project · Offshore wind · Poland
BC-Wind offshore wind farm
Poland, Baltic Sea. Planned start of operation (Global Wind Power Tracker, page of 2025-02-09): 2028.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (done)
- Fabrication (now)
- Transport & installation (next)
- Hook-up
- Commissioning
- Operation
Now Fabrication (reported: Financial close on 1 December 2025; moving from development into construction; onshore construction work begins in 2026 (Ocean Winds))
Next Transport & installation · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Role groups per phase: our planning assumption from the Crew Forecast model.
Later Operation 2028 (first power in 2028, as reported)
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- OW Ocean WindsOperator / ownerowner, 100% (Global Wind Power Tracker)
Who else needs construction people in Northwest Europe
May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.
How we count
Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.
- Kind
- Offshore wind
- Country
- Poland
- Size
- 390 MW
- Operator
- OW Ocean Winds
- Position
- 54.98°N 18.13°E, approximate
Sources
- Ocean Winds has reached financial close for its BC-Wind project in PolandOcean Winds · published 2025-12-01 · read 2026-10-24
- BC B - pre-construction (page of 2025-02-09)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2025-02-09 · read 2026-10-24