Project · Offshore wind

Baltica 2

Read from the Radar item below (2026-10-27); only what the source says.

  1. Engineering (next)
  2. Fabrication
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Before engineering

Next Engineering · not announced

Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • PGEOperator / owneroperator / owner, as named in the source
Kind
Offshore wind
Country
not announced
Operator
PGE
Position
not announced

Sources

  1. BGB Group awarded scaffolding contract for Baltica 2 offshore windoffshoreWIND.biz · published 2026-10-27 · read 2026-10-28