Project · Decommissioning · United Kingdom

Andrew field decommissioning

Integrated abandonment programme for the Andrew field: wells, facilities, pipelines, subsea infrastructure and eventual removal. The THREE60/AF Offshore Decom joint venture manages the programme for bp.

Checked by hand against the sources below (2026-11-08).

  1. Engineering (now)
  2. Fabrication (next)
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Engineering (reported: Preparatory engineering and lighthouse-mode work reported by the contractor; removal completion not confirmed.)

Next Fabrication · not announced

Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • bpOperator / ownerclient
  • THREE60 EnergyOperator / ownerduty holder and integrated decommissioning partner

Who else needs construction people in Northwest Europe

May 2027 is busier than usual here: 64 projects and stops in this phase, against a typical 21.5 a month.

34Nov 2026161317Feb 2027264064May 2027555144Aug 20273932
announced projectsplanned stopstypical phase length, not announcedas of 2026-11-11
How we count

Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.

Reserve people now

Contract awards public notices that name this project

Kind
Decommissioning
Country
United Kingdom
Operator
bp
Position
country only

Sources

  1. Operator-reported project and awarded contractsNSTA Energy Pathfinder · read 2026-11-08
  2. Andrew integrated decommissioning programmeTHREE60 Energy · read 2026-11-08