Company
Valorem
Named on 2 projects in the sources we follow. Each role as the source states it.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Operator / owner
Saare 2.1 offshore wind farm
Offshore wind · Estonia
owner (Global Wind Power Tracker)
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Next Fabrication, not announced
Source: Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0), 2026-02-05
Operator / owner
Saare 2.2 offshore wind farm
Offshore wind · Estonia
owner (Global Wind Power Tracker)
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Next Fabrication, not announced
Source: Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0), 2026-02-05
Works with named on the same projects
- Deep Wind Offshore · on Saare 2.1 offshore wind farm, Saare 2.2 offshore wind farm
- Sunly · on Saare 2.1 offshore wind farm
From the project database: hand-checked projects and Radar awards, each with its source. A company is listed where a source names it; this is not a client list.