Company

Samsung Heavy Industries

Named on 2 projects in the sources we follow. Each role as the source states it.

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

  1. EPC / main contractor

    Coral Norte FLNG

    Floating LNG · Mozambique

    EPCIC consortium partner

    1. Engineering (now)
    2. Fabrication (now)
    3. Transport & installation (next)
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Transport & installation, not announced

    Source: Offshore Technology, 2026-06-09

  2. EPC / main contractor

    ZLNG nearshore FLNG (PETRONAS FLNG 3), Sipitang, Sabah

    Floating LNG · Malaysia

    Consortium partner: EPC of the FLNG hull and modular fabrication of the topsides at Geoje (steel cut April 2024, hull launched February 2025)

    1. Engineering (done)
    2. Fabrication (now)
    3. Transport & installation (next)
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Transport & installation, not announced

    Source: JGC Holdings (company newsroom), 2023-01-06

Works with named on the same projects

From the project database: hand-checked projects and Radar awards, each with its source. A company is listed where a source names it; this is not a client list.