Company

NMDC Energy

Named on one project in the sources we follow. Each role as the source states it.

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

  1. EPC / main contractor

    Ruwais LNG — two-train all-electric export plant

    LNG · United Arab Emirates

    EPC joint-venture partner (construction)

    1. Engineering (done)
    2. Fabrication (now)
    3. Construction (now)
    4. Hook-up
    5. Commissioning (next)
    6. Operation

    Next Commissioning, 2028

    Source: ten.com, 2024-06-13

Works with named on the same projects

  • ADNOC · on Ruwais LNG — two-train all-electric export plant
  • JGC Corporation · on Ruwais LNG — two-train all-electric export plant
  • Technip Energies · on Ruwais LNG — two-train all-electric export plant

From the project database: hand-checked projects and Radar awards, each with its source. A company is listed where a source names it; this is not a client list.