Chiyoda Corporation

Named on 2 projects in the sources we follow. Each role as the source states it.

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

  1. EPC / main contractor

    Mozambique LNG (Golfinho/Atum, Area 1)

    LNG · Mozambique

    onshore LNG plant EPC consortium (contract predates the 2021 force-majeure suspension; consortium composition per trade press, not re-confirmed by a primary 2026 source in this check)

    1. Engineering (done)
    2. Fabrication (done)
    3. Construction (now)
    4. Hook-up
    5. Commissioning (next)
    6. Operation

    Next Commissioning, not announced

    Source: TotalEnergies (company press release), 2026-01-29

  2. EPC / main contractor

    North Field East and North Field South LNG expansion

    LNG · Qatar

    EPCC joint-venture partner with Technip Energies on North Field East; EPCC contract in joint venture

    1. Engineering (done)
    2. Fabrication (done)
    3. Construction (now)
    4. Hook-up
    5. Commissioning (now)
    6. Operation (next)

    Next Operation, H1 2027

    Source: Technip Energies / TechnipFMC, 2020s (original award)

Works with named on the same projects

  • CCC · on North Field East and North Field South LNG expansion
  • ExxonMobil · on Mozambique LNG (Golfinho/Atum, Area 1)
  • McDermott · on Mozambique LNG (Golfinho/Atum, Area 1)
  • OneSubsea · on Mozambique LNG (Golfinho/Atum, Area 1)
  • QatarEnergy · on North Field East and North Field South LNG expansion
  • Saipem · on Mozambique LNG (Golfinho/Atum, Area 1)
  • Technip Energies · on North Field East and North Field South LNG expansion
  • TotalEnergies · on Mozambique LNG (Golfinho/Atum, Area 1)