Company

China Petroleum Pipeline Engineering

Named on one project in the sources we follow. Each role as the source states it.

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

  1. Other role

    Gas Growth Integrated Project (GGIP), Ratawi

    Oil & gas, onshore · Iraq

    Reported contractor for the US$2.5 billion CSSP pipeline package (MEED, Sept 2026); earlier reported for the Gas Midstream Project (Zawya). Not confirmed in a contractor press release we opened

    1. Engineering (done)
    2. Fabrication (done)
    3. Construction (now)
    4. Hook-up
    5. Commissioning
    6. Operation (next)

    Next Operation, Q4 2026

    Source: TotalEnergies (company newsroom), 2025-09-15

Works with named on the same projects

  • ENKA · on Gas Growth Integrated Project (GGIP), Ratawi
  • Hyundai E&C · on Gas Growth Integrated Project (GGIP), Ratawi
  • TotalEnergies · on Gas Growth Integrated Project (GGIP), Ratawi

From the project database: hand-checked projects and Radar awards, each with its source. A company is listed where a source names it; this is not a client list.