BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//YRproject//Tender calendar//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Energy & offshore tender calendar 2026–2028
BEGIN:VEVENT
UID:nl-sde-plus-plus-2026-window-open@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261027
DTEND;VALUE=DATE:20261028
SUMMARY:Netherlands SDE++ 2026 application round (incl. CCS categories) —
  window opens
DESCRIPTION:RVO moved the round one month later than the 22 September-22 Oc
 tober window in the February 2026 letter to parliament\; the letter sets t
 he budget and adds CCS with low-carbon hydrogen and DAC categories. Author
 ity: RVO / Ministry of Climate Policy and Green Growth. Date as published 
 by the authority\; checked on 2026-10-08. Always check the source: https:/
 /www.rvo.nl/nieuws/meer-tijd-voor-aanvraag-sde-2026
URL:https://www.rvo.nl/nieuws/meer-tijd-voor-aanvraag-sde-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nl-sde-plus-plus-2026-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261126
DTEND;VALUE=DATE:20261127
SUMMARY:Netherlands SDE++ 2026 application round (incl. CCS categories) —
  window closes
DESCRIPTION:RVO moved the round one month later than the 22 September-22 Oc
 tober window in the February 2026 letter to parliament\; the letter sets t
 he budget and adds CCS with low-carbon hydrogen and DAC categories. Author
 ity: RVO / Ministry of Climate Policy and Green Growth. Date as published 
 by the authority\; checked on 2026-10-08. Always check the source: https:/
 /www.rvo.nl/nieuws/meer-tijd-voor-aanvraag-sde-2026
URL:https://www.rvo.nl/nieuws/meer-tijd-voor-aanvraag-sde-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nl-ijmuiden-ver-gamma-a-window-open@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261126
DTEND;VALUE=DATE:20261127
SUMMARY:IJmuiden Ver Gamma-A site permit with subsidy — window opens
DESCRIPTION:Permit with subsidy or a subsidy-free bid\, both procedures run
  at the same time\; maximum tender amount EUR 0.117 per kWh\; RVO expects 
 the wind farm to be operational in 2032. Authority: RVO / Ministry of Clim
 ate Policy and Green Growth (KGG). Date as published by the authority\; ch
 ecked on 2026-10-08. Always check the source: https://english.rvo.nl/subsi
 dies-financing/offshore-wind-energy/permit-ijmuiden-ver-gamma
URL:https://english.rvo.nl/subsidies-financing/offshore-wind-energy/permit-
 ijmuiden-ver-gamma
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nl-ijmuiden-ver-gamma-a-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261210
DTEND;VALUE=DATE:20261211
SUMMARY:IJmuiden Ver Gamma-A site permit with subsidy — window closes
DESCRIPTION:Permit with subsidy or a subsidy-free bid\, both procedures run
  at the same time\; maximum tender amount EUR 0.117 per kWh\; RVO expects 
 the wind farm to be operational in 2032. Authority: RVO / Ministry of Clim
 ate Policy and Green Growth (KGG). Date as published by the authority\; ch
 ecked on 2026-10-08. Always check the source: https://english.rvo.nl/subsi
 dies-financing/offshore-wind-energy/permit-ijmuiden-ver-gamma
URL:https://english.rvo.nl/subsidies-financing/offshore-wind-energy/permit-
 ijmuiden-ver-gamma
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nl-ijmuiden-ver-gamma-b-window-open@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261126
DTEND;VALUE=DATE:20261127
SUMMARY:IJmuiden Ver Gamma-B site permit with subsidy — window opens
DESCRIPTION:Added to the 2026 round by government decision in April 2026\; 
 maximum tender amount EUR 0.116 per kWh\; RVO expects the wind farm to be 
 operational in 2032. Authority: RVO / Ministry of Climate Policy and Green
  Growth (KGG). Date as published by the authority\; checked on 2026-10-08.
  Always check the source: https://english.rvo.nl/subsidies-financing/offsh
 ore-wind-energy/permit-ijmuiden-ver-gamma-b
URL:https://english.rvo.nl/subsidies-financing/offshore-wind-energy/permit-
 ijmuiden-ver-gamma-b
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nl-ijmuiden-ver-gamma-b-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261210
DTEND;VALUE=DATE:20261211
SUMMARY:IJmuiden Ver Gamma-B site permit with subsidy — window closes
DESCRIPTION:Added to the 2026 round by government decision in April 2026\; 
 maximum tender amount EUR 0.116 per kWh\; RVO expects the wind farm to be 
 operational in 2032. Authority: RVO / Ministry of Climate Policy and Green
  Growth (KGG). Date as published by the authority\; checked on 2026-10-08.
  Always check the source: https://english.rvo.nl/subsidies-financing/offsh
 ore-wind-energy/permit-ijmuiden-ver-gamma-b
URL:https://english.rvo.nl/subsidies-financing/offshore-wind-energy/permit-
 ijmuiden-ver-gamma-b
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR