BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//YRproject//Tender calendar//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Energy & offshore tender calendar 2026–2028
BEGIN:VEVENT
UID:dk-hesseloe-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260520
DTEND;VALUE=DATE:20260521
SUMMARY:Hesselø (Kattegat) offshore wind tender with two-sided CfD — win
 dow closes
DESCRIPTION:Awarded on 2026-08-04 to Vattenfall Vindkraft Offshore Wind DK 
 P/S at 542 DKK/MWh\; the agency reports five bids\; commissioning required
  by end of 2032. Authority: Energistyrelsen (Danish Energy Agency). Date a
 s published by the authority\; checked on 2026-10-08. Always check the sou
 rce: https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
URL:https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dk-hesseloe-award-expected@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260804
DTEND;VALUE=DATE:20260805
SUMMARY:Hesselø (Kattegat) offshore wind tender with two-sided CfD — awa
 rded
DESCRIPTION:Awarded on 2026-08-04 to Vattenfall Vindkraft Offshore Wind DK 
 P/S at 542 DKK/MWh\; the agency reports five bids\; commissioning required
  by end of 2032. Authority: Energistyrelsen (Danish Energy Agency). Date a
 s published by the authority\; checked on 2026-10-08. Always check the sou
 rce: https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
URL:https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dk-nordsoeen-i-midt-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260520
DTEND;VALUE=DATE:20260521
SUMMARY:Nordsøen I Midt offshore wind tender with two-sided CfD — window
  closes
DESCRIPTION:Awarded on 2026-08-04 to Vattenfall Vindkraft A/S (on behalf of
  a company to be formed) at 504 DKK/MWh\; the agency reports two bids\; co
 mmissioning required by end of 2032. Authority: Energistyrelsen (Danish En
 ergy Agency). Date as published by the authority\; checked on 2026-10-08. 
 Always check the source: https://ens.dk/presse/danmark-faar-nye-havvindmoe
 lleparker
URL:https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dk-nordsoeen-i-midt-award-expected@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260804
DTEND;VALUE=DATE:20260805
SUMMARY:Nordsøen I Midt offshore wind tender with two-sided CfD — awarde
 d
DESCRIPTION:Awarded on 2026-08-04 to Vattenfall Vindkraft A/S (on behalf of
  a company to be formed) at 504 DKK/MWh\; the agency reports two bids\; co
 mmissioning required by end of 2032. Authority: Energistyrelsen (Danish En
 ergy Agency). Date as published by the authority\; checked on 2026-10-08. 
 Always check the source: https://ens.dk/presse/danmark-faar-nye-havvindmoe
 lleparker
URL:https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dk-nordsoeen-i-syd-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20281023
DTEND;VALUE=DATE:20281024
SUMMARY:Nordsøen I Syd offshore wind tender with two-sided CfD — window 
 closes
DESCRIPTION:Tender opened 2025-11-20 together with Midt and Hesselø\; bid 
 deadline 2028-10-23\; commissioning required by end of 2034\; support cap 
 of DKK 55.2 bn covers all three parks. Authority: Energistyrelsen (Danish 
 Energy Agency). Date as published by the authority\; checked on 2026-10-08
 . Always check the source: https://ens.dk/energikilder/nordsoeen-i-syd-og-
 midt-havvindmoelleparker
URL:https://ens.dk/energikilder/nordsoeen-i-syd-og-midt-havvindmoelleparker
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:eu-hydrogen-bank-if25-auction-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260219
DTEND;VALUE=DATE:20260220
SUMMARY:EU Innovation Fund hydrogen auction IF25 (third European Hydrogen B
 ank auction) — window closes
DESCRIPTION:Awarded on 7 May 2026: nine projects selected\, four reserve pr
 ojects invited in June 2026\; grant agreement signature expected September
 -November 2026. Authority: European Commission (DG CLIMA) / CINEA. Date as
  published by the authority\; checked on 2026-10-08. Always check the sour
 ce: https://climate.ec.europa.eu/areas-action/eu-funding-climate-action/in
 novation-fund/calls-proposals/if25-hydrogen-auction_en
URL:https://climate.ec.europa.eu/areas-action/eu-funding-climate-action/inn
 ovation-fund/calls-proposals/if25-hydrogen-auction_en
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:eu-hydrogen-bank-if25-auction-award-expected@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260507
DTEND;VALUE=DATE:20260508
SUMMARY:EU Innovation Fund hydrogen auction IF25 (third European Hydrogen B
 ank auction) — awarded
DESCRIPTION:Awarded on 7 May 2026: nine projects selected\, four reserve pr
 ojects invited in June 2026\; grant agreement signature expected September
 -November 2026. Authority: European Commission (DG CLIMA) / CINEA. Date as
  published by the authority\; checked on 2026-10-08. Always check the sour
 ce: https://climate.ec.europa.eu/areas-action/eu-funding-climate-action/in
 novation-fund/calls-proposals/if25-hydrogen-auction_en
URL:https://climate.ec.europa.eu/areas-action/eu-funding-climate-action/inn
 ovation-fund/calls-proposals/if25-hydrogen-auction_en
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:uk-nsta-carbon-storage-round-2-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260324
DTEND;VALUE=DATE:20260325
SUMMARY:UK second carbon storage licensing round — window closes
DESCRIPTION:Applications closed 24 March 2026\; NSTA aims to award licences
  in early 2027\; five areas in Scottish and nine in English waters. Author
 ity: North Sea Transition Authority (NSTA). Date as published by the autho
 rity\; checked on 2026-10-08. Always check the source: https://www.nstauth
 ority.co.uk/news-publications/nsta-launches-uk-s-second-carbon-storage-lic
 ensing-round/
URL:https://www.nstauthority.co.uk/news-publications/nsta-launches-uk-s-sec
 ond-carbon-storage-licensing-round/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:no-apa-2025-award-expected@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260113
DTEND;VALUE=DATE:20260114
SUMMARY:Norway APA 2025 (awards in predefined areas) — awarded
DESCRIPTION:Awarded on 13 January 2026: 19 companies were offered interests
  in 57 production licences. Authority: Ministry of Energy / Norwegian Offs
 hore Directorate. Date as published by the authority\; checked on 2026-10-
 08. Always check the source: https://www.norskpetroleum.no/en/exploration/
 licensing-position-for-the-norwegian-continental-shelf/
URL:https://www.norskpetroleum.no/en/exploration/licensing-position-for-the
 -norwegian-continental-shelf/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:uk-cfd-ar7-offshore-wind-award-expected@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260114
DTEND;VALUE=DATE:20260115
SUMMARY:CfD Allocation Round 7 - offshore wind and floating offshore wind r
 esults — awarded
DESCRIPTION:Awarded on 2026-01-14: DESNZ published the Pot 3 and Pot 4 outc
 ome as NESO notified applicants\; ten fixed-bottom CfD units and two float
 ing projects (Erebus\, Pentland) listed. Authority: DESNZ / NESO. Date as 
 published by the authority\; checked on 2026-10-08. Always check the sourc
 e: https://assets.publishing.service.gov.uk/media/6966861de8c04eb2919f773a
 /contracts-for-difference-allocation-round-7-results-.pdf
URL:https://assets.publishing.service.gov.uk/media/6966861de8c04eb2919f773a
 /contracts-for-difference-allocation-round-7-results-.pdf
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dk-ccs-fund-tender-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260204
DTEND;VALUE=DATE:20260205
SUMMARY:Denmark CCS fund tender (CCS-puljen) — window closes
DESCRIPTION:Final bids due 4 February 2026\; awarded on 5 May 2026 to Aalbo
 rg Portland for capture\, transport and storage\; support period 2029-2044
 . Authority: Danish Energy Agency (Energistyrelsen). Date as published by 
 the authority\; checked on 2026-10-08. Always check the source: https://en
 s.dk/forsyning-og-forbrug/ccs-udbud-og-anden-stoette-til-udvikling-af-ccs
URL:https://ens.dk/forsyning-og-forbrug/ccs-udbud-og-anden-stoette-til-udvi
 kling-af-ccs
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dk-ccs-fund-tender-award-expected@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260505
DTEND;VALUE=DATE:20260506
SUMMARY:Denmark CCS fund tender (CCS-puljen) — awarded
DESCRIPTION:Final bids due 4 February 2026\; awarded on 5 May 2026 to Aalbo
 rg Portland for capture\, transport and storage\; support period 2029-2044
 . Authority: Danish Energy Agency (Energistyrelsen). Date as published by 
 the authority\; checked on 2026-10-08. Always check the source: https://en
 s.dk/forsyning-og-forbrug/ccs-udbud-og-anden-stoette-til-udvikling-af-ccs
URL:https://ens.dk/forsyning-og-forbrug/ccs-udbud-og-anden-stoette-til-udvi
 kling-af-ccs
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:uk-tce-round5-celtic-sea-award-expected@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260303
DTEND;VALUE=DATE:20260304
SUMMARY:Offshore Wind Leasing Round 5 - Celtic Sea floating wind\, third si
 te — awarded
DESCRIPTION:Ocean Winds named for the third site on 2025-11-19 via direct a
 ward and entered the agreement for lease announced 2026-03-03\; the other 
 two sites (Equinor\, Gwynt Glas) signed in October 2025. Authority: The Cr
 own Estate. Date as published by the authority\; checked on 2026-10-08. Al
 ways check the source: https://www.thecrownestate.co.uk/news/final-site-pr
 ogressing-for-round-5
URL:https://www.thecrownestate.co.uk/news/final-site-progressing-for-round-
 5
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:de-ccfd-gebotsverfahren-2026-window-open@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260505
DTEND;VALUE=DATE:20260506
SUMMARY:Germany CO2 contracts for difference (Klimaschutzvertraege)\, biddi
 ng round 2026 — window opens
DESCRIPTION:Bidding ran 5 May to 9 September 2026 for participants of the p
 receding preparatory procedure\; CCU/CCS technologies eligible\; the minis
 try reports 21 bids\; no award date published. Authority: BMWE. Date as pu
 blished by the authority\; checked on 2026-10-08. Always check the source:
  https://www.co2-differenzvertraege.info/thema/aktuelles_gebotsverfahren
URL:https://www.co2-differenzvertraege.info/thema/aktuelles_gebotsverfahren
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:de-ccfd-gebotsverfahren-2026-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260909
DTEND;VALUE=DATE:20260910
SUMMARY:Germany CO2 contracts for difference (Klimaschutzvertraege)\, biddi
 ng round 2026 — window closes
DESCRIPTION:Bidding ran 5 May to 9 September 2026 for participants of the p
 receding preparatory procedure\; CCU/CCS technologies eligible\; the minis
 try reports 21 bids\; no award date published. Authority: BMWE. Date as pu
 blished by the authority\; checked on 2026-10-08. Always check the source:
  https://www.co2-differenzvertraege.info/thema/aktuelles_gebotsverfahren
URL:https://www.co2-differenzvertraege.info/thema/aktuelles_gebotsverfahren
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:no-apa-2026-window-open@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260505
DTEND;VALUE=DATE:20260506
SUMMARY:Norway APA 2026 (awards in predefined areas) — window opens
DESCRIPTION:Announced 5 May 2026 for predefined areas in the North Sea\, No
 rwegian Sea and Barents Sea\; applications closed 1 September 2026 at 12:0
 0\; awards expected during the first quarter of 2027. Authority: Ministry 
 of Energy / Norwegian Offshore Directorate. Date as published by the autho
 rity\; checked on 2026-10-08. Always check the source: https://www.norskpe
 troleum.no/en/exploration/licensing-position-for-the-norwegian-continental
 -shelf/
URL:https://www.norskpetroleum.no/en/exploration/licensing-position-for-the
 -norwegian-continental-shelf/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:no-apa-2026-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260901
DTEND;VALUE=DATE:20260902
SUMMARY:Norway APA 2026 (awards in predefined areas) — window closes
DESCRIPTION:Announced 5 May 2026 for predefined areas in the North Sea\, No
 rwegian Sea and Barents Sea\; applications closed 1 September 2026 at 12:0
 0\; awards expected during the first quarter of 2027. Authority: Ministry 
 of Energy / Norwegian Offshore Directorate. Date as published by the autho
 rity\; checked on 2026-10-08. Always check the source: https://www.norskpe
 troleum.no/en/exploration/licensing-position-for-the-norwegian-continental
 -shelf/
URL:https://www.norskpetroleum.no/en/exploration/licensing-position-for-the
 -norwegian-continental-shelf/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fr-offshore-wind-ao10-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261012
DTEND;VALUE=DATE:20261013
SUMMARY:France offshore wind tender AO10 (eleven projects\, fixed and float
 ing) — window closes
DESCRIPTION:Tender no. 1/2026 covers eleven projects off Normandy\, Brittan
 y\, the South Atlantic coast and in the Mediterranean\; projects first pla
 nned under AO9 were folded into AO10\; bids due 12 Oct 2026 12:00 Paris ti
 me\; CRE published amended specifications on 20 Aug\, 24 Sep and 7 Oct 202
 6\; ministry states award in February 2027. Authority: Ministry in charge 
 of energy (DGEC) / CRE. Date as published by the authority\; checked on 20
 26-10-08. Always check the source: https://www.cre.fr/documents/appels-dof
 fres/appel-doffres-n1/2026-portant-sur-onze-projets-dinstallations-eolienn
 es-de-production-delectricite-en-mer-situes-au-large-de-la-normandie-au-la
 rge-de-la-bretagne-en-sud-atlantique-et-en-mer-mediterranee.html
URL:https://www.cre.fr/documents/appels-doffres/appel-doffres-n1/2026-porta
 nt-sur-onze-projets-dinstallations-eoliennes-de-production-delectricite-en
 -mer-situes-au-large-de-la-normandie-au-large-de-la-bretagne-en-sud-atlant
 ique-et-en-mer-mediterranee.html
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:uk-cfd-ar8-window-open@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260720
DTEND;VALUE=DATE:20260721
SUMMARY:CfD Allocation Round 8 - all technologies incl. offshore wind — w
 indow opens
DESCRIPTION:Application window ran 20 July-7 August 2026\; the indicative t
 imetable puts NESO result notification between 27 Nov-1 Dec 2026 (no appea
 ls) and 15-17 Feb 2027 (Tier 2 appeals)\, depending on the qualification s
 cenario. Authority: DESNZ / NESO / LCCC. Date as published by the authorit
 y\; checked on 2026-10-08. Always check the source: https://assets.publish
 ing.service.gov.uk/media/6a4b8cf0d200ca05e289e5c5/CfD-AR8-application-wind
 ow-notice.pdf
URL:https://assets.publishing.service.gov.uk/media/6a4b8cf0d200ca05e289e5c5
 /CfD-AR8-application-window-notice.pdf
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:uk-cfd-ar8-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260807
DTEND;VALUE=DATE:20260808
SUMMARY:CfD Allocation Round 8 - all technologies incl. offshore wind — w
 indow closes
DESCRIPTION:Application window ran 20 July-7 August 2026\; the indicative t
 imetable puts NESO result notification between 27 Nov-1 Dec 2026 (no appea
 ls) and 15-17 Feb 2027 (Tier 2 appeals)\, depending on the qualification s
 cenario. Authority: DESNZ / NESO / LCCC. Date as published by the authorit
 y\; checked on 2026-10-08. Always check the source: https://assets.publish
 ing.service.gov.uk/media/6a4b8cf0d200ca05e289e5c5/CfD-AR8-application-wind
 ow-notice.pdf
URL:https://assets.publishing.service.gov.uk/media/6a4b8cf0d200ca05e289e5c5
 /CfD-AR8-application-window-notice.pdf
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:uk-tce-morgan-tender-window-open@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260724
DTEND;VALUE=DATE:20260725
SUMMARY:Morgan offshore wind site tender - Irish Sea\, re-tender of a Round
  4 site — window opens
DESCRIPTION:Accelerated re-tender of the Round 4 site discontinued in Janua
 ry 2026\; offers a 10-year agreement for lease with the windfarm DCO (Augu
 st 2025) and a NESO grid connection agreement in place. Open to sole bidde
 rs or consortia registered on The Crown Estate e-tendering portal\; one qu
 estionnaire submission each\, due 4 September 2026\, decides entry to an a
 scending clock auction on a Site Exclusivity Fee paid over 20 years from l
 ease. The 24 July notice was replaced on 27 July by a competitive flexible
  procedure notice with unchanged deadlines\; Find a Tender gives 20 Novemb
 er 2026 as the estimated award decision date\; The Crown Estate expects th
 e auction and selection of a preferred bidder towards the end of 2026. Aut
 hority: The Crown Estate. Date as published by the authority\; checked on 
 2026-10-08. Always check the source: https://www.thecrownestate.co.uk/news
 /the-crown-estate-launches-accelerated-tender-for-morgan-offshore-wind-sit
 e
URL:https://www.thecrownestate.co.uk/news/the-crown-estate-launches-acceler
 ated-tender-for-morgan-offshore-wind-site
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:uk-tce-morgan-tender-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260904
DTEND;VALUE=DATE:20260905
SUMMARY:Morgan offshore wind site tender - Irish Sea\, re-tender of a Round
  4 site — window closes
DESCRIPTION:Accelerated re-tender of the Round 4 site discontinued in Janua
 ry 2026\; offers a 10-year agreement for lease with the windfarm DCO (Augu
 st 2025) and a NESO grid connection agreement in place. Open to sole bidde
 rs or consortia registered on The Crown Estate e-tendering portal\; one qu
 estionnaire submission each\, due 4 September 2026\, decides entry to an a
 scending clock auction on a Site Exclusivity Fee paid over 20 years from l
 ease. The 24 July notice was replaced on 27 July by a competitive flexible
  procedure notice with unchanged deadlines\; Find a Tender gives 20 Novemb
 er 2026 as the estimated award decision date\; The Crown Estate expects th
 e auction and selection of a preferred bidder towards the end of 2026. Aut
 hority: The Crown Estate. Date as published by the authority\; checked on 
 2026-10-08. Always check the source: https://www.thecrownestate.co.uk/news
 /the-crown-estate-launches-accelerated-tender-for-morgan-offshore-wind-sit
 e
URL:https://www.thecrownestate.co.uk/news/the-crown-estate-launches-acceler
 ated-tender-for-morgan-offshore-wind-site
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nl-sde-plus-plus-2026-window-open@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261027
DTEND;VALUE=DATE:20261028
SUMMARY:Netherlands SDE++ 2026 application round (incl. CCS categories) —
  window opens
DESCRIPTION:RVO moved the round one month later than the 22 September-22 Oc
 tober window in the February 2026 letter to parliament\; the letter sets t
 he budget and adds CCS with low-carbon hydrogen and DAC categories. Author
 ity: RVO / Ministry of Climate Policy and Green Growth. Date as published 
 by the authority\; checked on 2026-10-08. Always check the source: https:/
 /www.rvo.nl/nieuws/meer-tijd-voor-aanvraag-sde-2026
URL:https://www.rvo.nl/nieuws/meer-tijd-voor-aanvraag-sde-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nl-sde-plus-plus-2026-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261126
DTEND;VALUE=DATE:20261127
SUMMARY:Netherlands SDE++ 2026 application round (incl. CCS categories) —
  window closes
DESCRIPTION:RVO moved the round one month later than the 22 September-22 Oc
 tober window in the February 2026 letter to parliament\; the letter sets t
 he budget and adds CCS with low-carbon hydrogen and DAC categories. Author
 ity: RVO / Ministry of Climate Policy and Green Growth. Date as published 
 by the authority\; checked on 2026-10-08. Always check the source: https:/
 /www.rvo.nl/nieuws/meer-tijd-voor-aanvraag-sde-2026
URL:https://www.rvo.nl/nieuws/meer-tijd-voor-aanvraag-sde-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nl-ijmuiden-ver-gamma-a-window-open@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261126
DTEND;VALUE=DATE:20261127
SUMMARY:IJmuiden Ver Gamma-A site permit with subsidy — window opens
DESCRIPTION:Permit with subsidy or a subsidy-free bid\, both procedures run
  at the same time\; maximum tender amount EUR 0.117 per kWh\; RVO expects 
 the wind farm to be operational in 2032. Authority: RVO / Ministry of Clim
 ate Policy and Green Growth (KGG). Date as published by the authority\; ch
 ecked on 2026-10-08. Always check the source: https://english.rvo.nl/subsi
 dies-financing/offshore-wind-energy/permit-ijmuiden-ver-gamma
URL:https://english.rvo.nl/subsidies-financing/offshore-wind-energy/permit-
 ijmuiden-ver-gamma
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nl-ijmuiden-ver-gamma-a-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261210
DTEND;VALUE=DATE:20261211
SUMMARY:IJmuiden Ver Gamma-A site permit with subsidy — window closes
DESCRIPTION:Permit with subsidy or a subsidy-free bid\, both procedures run
  at the same time\; maximum tender amount EUR 0.117 per kWh\; RVO expects 
 the wind farm to be operational in 2032. Authority: RVO / Ministry of Clim
 ate Policy and Green Growth (KGG). Date as published by the authority\; ch
 ecked on 2026-10-08. Always check the source: https://english.rvo.nl/subsi
 dies-financing/offshore-wind-energy/permit-ijmuiden-ver-gamma
URL:https://english.rvo.nl/subsidies-financing/offshore-wind-energy/permit-
 ijmuiden-ver-gamma
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nl-ijmuiden-ver-gamma-b-window-open@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261126
DTEND;VALUE=DATE:20261127
SUMMARY:IJmuiden Ver Gamma-B site permit with subsidy — window opens
DESCRIPTION:Added to the 2026 round by government decision in April 2026\; 
 maximum tender amount EUR 0.116 per kWh\; RVO expects the wind farm to be 
 operational in 2032. Authority: RVO / Ministry of Climate Policy and Green
  Growth (KGG). Date as published by the authority\; checked on 2026-10-08.
  Always check the source: https://english.rvo.nl/subsidies-financing/offsh
 ore-wind-energy/permit-ijmuiden-ver-gamma-b
URL:https://english.rvo.nl/subsidies-financing/offshore-wind-energy/permit-
 ijmuiden-ver-gamma-b
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nl-ijmuiden-ver-gamma-b-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20261210
DTEND;VALUE=DATE:20261211
SUMMARY:IJmuiden Ver Gamma-B site permit with subsidy — window closes
DESCRIPTION:Added to the 2026 round by government decision in April 2026\; 
 maximum tender amount EUR 0.116 per kWh\; RVO expects the wind farm to be 
 operational in 2032. Authority: RVO / Ministry of Climate Policy and Green
  Growth (KGG). Date as published by the authority\; checked on 2026-10-08.
  Always check the source: https://english.rvo.nl/subsidies-financing/offsh
 ore-wind-energy/permit-ijmuiden-ver-gamma-b
URL:https://english.rvo.nl/subsidies-financing/offshore-wind-energy/permit-
 ijmuiden-ver-gamma-b
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR