BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//YRproject//Tender calendar//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Energy & offshore tender calendar 2026–2028
BEGIN:VEVENT
UID:dk-hesseloe-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260520
DTEND;VALUE=DATE:20260521
SUMMARY:Hesselø (Kattegat) offshore wind tender with two-sided CfD — win
 dow closes
DESCRIPTION:Awarded on 2026-08-04 to Vattenfall Vindkraft Offshore Wind DK 
 P/S at 542 DKK/MWh\; the agency reports five bids\; commissioning required
  by end of 2032. Authority: Energistyrelsen (Danish Energy Agency). Date a
 s published by the authority\; checked on 2026-10-08. Always check the sou
 rce: https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
URL:https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dk-hesseloe-award-expected@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260804
DTEND;VALUE=DATE:20260805
SUMMARY:Hesselø (Kattegat) offshore wind tender with two-sided CfD — awa
 rded
DESCRIPTION:Awarded on 2026-08-04 to Vattenfall Vindkraft Offshore Wind DK 
 P/S at 542 DKK/MWh\; the agency reports five bids\; commissioning required
  by end of 2032. Authority: Energistyrelsen (Danish Energy Agency). Date a
 s published by the authority\; checked on 2026-10-08. Always check the sou
 rce: https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
URL:https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dk-nordsoeen-i-midt-window-close@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260520
DTEND;VALUE=DATE:20260521
SUMMARY:Nordsøen I Midt offshore wind tender with two-sided CfD — window
  closes
DESCRIPTION:Awarded on 2026-08-04 to Vattenfall Vindkraft A/S (on behalf of
  a company to be formed) at 504 DKK/MWh\; the agency reports two bids\; co
 mmissioning required by end of 2032. Authority: Energistyrelsen (Danish En
 ergy Agency). Date as published by the authority\; checked on 2026-10-08. 
 Always check the source: https://ens.dk/presse/danmark-faar-nye-havvindmoe
 lleparker
URL:https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dk-nordsoeen-i-midt-award-expected@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260804
DTEND;VALUE=DATE:20260805
SUMMARY:Nordsøen I Midt offshore wind tender with two-sided CfD — awarde
 d
DESCRIPTION:Awarded on 2026-08-04 to Vattenfall Vindkraft A/S (on behalf of
  a company to be formed) at 504 DKK/MWh\; the agency reports two bids\; co
 mmissioning required by end of 2032. Authority: Energistyrelsen (Danish En
 ergy Agency). Date as published by the authority\; checked on 2026-10-08. 
 Always check the source: https://ens.dk/presse/danmark-faar-nye-havvindmoe
 lleparker
URL:https://ens.dk/presse/danmark-faar-nye-havvindmoelleparker
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:uk-cfd-ar7-offshore-wind-award-expected@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260114
DTEND;VALUE=DATE:20260115
SUMMARY:CfD Allocation Round 7 - offshore wind and floating offshore wind r
 esults — awarded
DESCRIPTION:Awarded on 2026-01-14: DESNZ published the Pot 3 and Pot 4 outc
 ome as NESO notified applicants\; ten fixed-bottom CfD units and two float
 ing projects (Erebus\, Pentland) listed. Authority: DESNZ / NESO. Date as 
 published by the authority\; checked on 2026-10-08. Always check the sourc
 e: https://assets.publishing.service.gov.uk/media/6966861de8c04eb2919f773a
 /contracts-for-difference-allocation-round-7-results-.pdf
URL:https://assets.publishing.service.gov.uk/media/6966861de8c04eb2919f773a
 /contracts-for-difference-allocation-round-7-results-.pdf
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:uk-tce-round5-celtic-sea-award-expected@yrproject.nl
DTSTAMP:20261008T000000Z
DTSTART;VALUE=DATE:20260303
DTEND;VALUE=DATE:20260304
SUMMARY:Offshore Wind Leasing Round 5 - Celtic Sea floating wind\, third si
 te — awarded
DESCRIPTION:Ocean Winds named for the third site on 2025-11-19 via direct a
 ward and entered the agreement for lease announced 2026-03-03\; the other 
 two sites (Equinor\, Gwynt Glas) signed in October 2025. Authority: The Cr
 own Estate. Date as published by the authority\; checked on 2026-10-08. Al
 ways check the source: https://www.thecrownestate.co.uk/news/final-site-pr
 ogressing-for-round-5
URL:https://www.thecrownestate.co.uk/news/final-site-progressing-for-round-
 5
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
